In many manufacturing companies, controlling did not emerge as a coherent system, but as the sum of successive solutions added in response to current needs. First came spreadsheets for cost budgeting, then separate files for sales planning, and over time further workbooks for analysing work in progress, margins or unit costs. Each of these elements worked correctly within its own scope, but together they created an environment that was hard to maintain.
Over time, Excel stopped supporting decisions and started delaying them. Changing a single assumption in the sales plan required manually recalculating material costs, labour costs and margins in several files at once. Historical data got mixed up with plans, and teams spent more and more time checking which version of the spreadsheet was current instead of analysing results. At that point Excel becomes the bottleneck of financial controlling rather than its tool.
The starting point of the project: lots of data, little consistency
In the project described here, the company had no problem with access to data. There was sales data, production data, information about orders and work in progress, and complete accounting data. The problem was that each of these pieces of information lived in a different context and a different tool, which made it hard to put them together into one coherent picture of the situation.
As Paweł Makowski, analyst and data engineer in the FlexiEPM team, puts it, his role in the project was to process data from different systems and align its reporting so that it matched the real needs of controlling. Before the implementation, most planning and analysis was done in Excel, which meant heavy dependence on the manual work of finance teams and a high risk of errors every time assumptions changed.
ERP data as the foundation of financial controlling
ERP and EPM systems: different roles, a single source of truth
An important element of the project was linking controlling with the ERP system that supplied the operational data. In this case it was Radius, the system responsible for planning, settling and parameterising production, managing the product and material portfolio, invoicing and recording operating costs. However, the ERP data was not transferred to FlexiEPM mechanically.
It had to be mapped, reconciled and adapted to controlling logic, because the ERP system and financial controlling operate at different levels of detail. Some costs were posted in aggregate and in EPM had to be broken down and assigned to processes, products and planning groups. As Paweł points out:

FlexiEPM does not replace ERP, but works as an analytical layer that combines information from ERP and accounting. It is in this layer that the data starts to answer management questions, not just accounting ones. As a result, the same numbers can be analysed in the context of production, sales, margin and planning, and not only by account.
The COGS calculation model as the heart of production controlling
One of the key elements of the implementation was the calculation model for COGS, the cost of goods sold. This is an area that many companies simplify, because calculating it correctly requires combining data from production, sales, accounting and logistics.
In this project the COGS calculation model covered a very large number of dependencies and attributes. The data was processed across hundreds of columns, and the whole logic had to be turned into a coherent algorithm that can be maintained and developed over time. Paweł recalls that processing data across about four hundred columns was a clear sign that Excel was no longer a safe environment for this type of analysis.
Historical data as the reference point for planning production costs
A key assumption of the implementation was to base production and cost planning on historical data, rather than on rigid standards or the simplified assumptions that had previously lived in Excel spreadsheets. The idea was that the starting point for planning should not be an abstract calculation, but a real picture of how production actually worked in the past.
The system analyses only closed production orders for the indicated period, because only they show a complete and reliable picture of actual material and labour costs. Only on such a data set can you build a sensible planning model that does not distort reality and does not require constant manual adjustments.
The planning process consists of several linked steps: calculating the unit weight of the finished product, determining average weights for planning groups, converting the sales volume into kilograms, calculating material requirements and, where needed, adjusting the plan with indicators.
Based on this data, FlexiEPM calculates actual indicators that become the reference point for planning the future. As a result, production planning is not based on assumptions “from Excel”, but on what actually happened in the company in previous periods, taking into account real volumes, costs and efficiency.
The unit of measure as a real controlling problem
One of the more technical, and at the same time key, elements of the project was converting sales volumes from commercial units into kilograms. Products are sold in different units (pieces, running metres or packages), while material and production costs relate to weight, which in practice is often a source of simplifications and wrong assumptions.
The implementation therefore required putting this area in order. In practice this meant calculating the unit weight of the finished product, determining average weights for planning groups and converting the sales plan into material requirements expressed in kilograms. Only such a model makes it possible to link sales with the actual consumption of raw materials and production costs.
As a result, production planning was based on actual material consumption, not on the simplified conversion factors known from Excel. Importantly, the system also allows correction indicators to be applied when technology, the material structure, raw material prices or the efficiency of production processes change, without having to rebuild the whole model.
Labour costs calculated by time, not by assumptions
How historical data replaces manual allocations
Labour costs in the COGS model were linked directly to production time, not to simplified allocation keys or manual allocations. The system analyses the historical production time of products, calculates average times for individual product groups and on this basis converts the sales plan into time requirements.
As a result, labour costs are allocated in proportion to the expected load on production processes, not according to percentages assumed in advance. As Paweł points out:

This approach makes it easier to understand which products and processes actually consume the most resources, and financial controlling is no longer based on assumptions that are hard to verify.
Cascading planning as part of the EPM system
Sales and budget planning was designed in a cascading way, in line with the organisation’s real decision-making structure. The process starts at the level of the management board, which defines the target sales volumes. The finance director then splits them between sales teams, and salespeople plan sales at the level of specific products and months.
In FlexiEPM this whole process runs on shared data and consistent definitions, so changes made at one level are immediately visible at the next ones. This is a fundamental difference compared with Excel, where every adjustment required manual reconciliation, updates to many files and additional checks.
Production controlling is more than manufacturing
The project covered much more than the manufacturing cost alone. In FlexiEPM, models were built that cover the whole cycle, from production through sales to logistics and related costs. Controlling stopped being an analysis of only what happened on the shop floor and began to cover the full business context.
A good example is transport cost planning. The system takes into account how the finished product is palletised, the sales volume, the shipping destinations and variable transport rates. On this basis the shipping cost is calculated per product unit or per pallet, which makes it possible to analyse its impact on margin.
It also matters that these assumptions can be adjusted during the year. If transport rates, the shipping structure or the packaging method change, the model does not lose consistency but responds to the new data.
Planning of commissions, discounts and cash discounts works in a similar way. Salespeople enter the commercial terms, and the system automatically recalculates their impact on the financial result over time, so controlling is not a delayed analysis but a tool for day-to-day management.
One EPM system instead of many Excel files
From the users’ perspective, the biggest change was that financial controlling, production planning and data analysis started working in one environment. Data from ERP, sales and production stopped functioning as separate entities, and FlexiEPM became a decision layer on top of data that had existed before but was not fully used.
This is particularly important in manufacturing companies, where the relationships between costs, volume and margin are complex and change over time.
The result of the implementation? Controlling that really supports decisions
The project was demanding and multi-stage, but its effect quickly translated into the daily work of the finance teams. Instead of manual calculations and constant data reconciliation, there was room for analysis, discussion and informed business decisions.
As Paweł sums up, once the whole logic was connected and put in order, the satisfaction was visible, because the system simply worked.

Recently, in one of our conversations with the client, we heard: “Flexi is 1000x better and more accurate than the old data warehouse”. That shows the scale of the change best.
Although talks are still under way about refining selected elements and adjusting some processes, the foundation works reliably. And that means one thing: controlling stops being an operational bottleneck and starts to really support business decisions.